Difference between revisions of "PBMinutes"
From CunningWiki
m |
m |
||
Line 1: | Line 1: | ||
− | '''Camera Z Mount knobs hit each other''' | + | '''Camera Z Mount knobs hit each other''' (30min) |
*Turn the second hole into a slot so it looks intentionally adjustable | *Turn the second hole into a slot so it looks intentionally adjustable | ||
*Re-drill holes wider? (makes it look unintentional) | *Re-drill holes wider? (makes it look unintentional) | ||
− | '''Camera Z Mount is too long''' | + | '''Camera Z Mount is too long''' (1hour) |
*De-rivet right angle | *De-rivet right angle | ||
Line 10: | Line 10: | ||
*re drill, re-rivet piece in | *re drill, re-rivet piece in | ||
− | '''Mount in Camera support rails''' | + | '''Mount in Camera support rails''' (30min) |
*drill slide rail holes | *drill slide rail holes | ||
*Rivet into box | *Rivet into box | ||
− | '''Make Cap touch Sensor''' | + | '''Make Cap touch Sensor''' (1 hour) |
*step 1) print out a stencil | *step 1) print out a stencil | ||
Line 29: | Line 29: | ||
*step 11) add a LED, EL, matrix or other type of back light to illuminate this assembly | *step 11) add a LED, EL, matrix or other type of back light to illuminate this assembly | ||
− | '''Make new front panel''' | + | '''Make new front panel''' (1 hour) |
+ | *cut wood to size | ||
+ | *cut plastic to size | ||
+ | *apply adhesive to surface and install window | ||
− | '''Install Monitor''' | + | '''Install Monitor''' (2 hour) |
*Cut out hole | *Cut out hole | ||
− | * | + | *Design and install retention system |
+ | *must be removable | ||
'''Need LED Ring''' (4 hours) | '''Need LED Ring''' (4 hours) | ||
Line 44: | Line 48: | ||
*Wire 5 drive circuits | *Wire 5 drive circuits | ||
− | '''Need to design door ''' | + | '''Need to design door ''' (2 hours) |
*Need to cut door out | *Need to cut door out | ||
Line 52: | Line 56: | ||
*install combi-lock | *install combi-lock | ||
− | '''Need Foot Stands''' | + | '''Need Foot Stands''' (30 mins) |
*Lathe | *Lathe |
Revision as of 08:14, 20 April 2012
Camera Z Mount knobs hit each other (30min)
- Turn the second hole into a slot so it looks intentionally adjustable
- Re-drill holes wider? (makes it look unintentional)
Camera Z Mount is too long (1hour)
- De-rivet right angle
- Cut aluminum section
- re drill, re-rivet piece in
Mount in Camera support rails (30min)
- drill slide rail holes
- Rivet into box
Make Cap touch Sensor (1 hour)
- step 1) print out a stencil
- step 2) tape a copper sheet onto the back of the stencil
- step 3) cut out stencil
- step 4) apply PSA to top of the copper tape
- step 5) peel off PSA protector and stick to polyethalyne
- step 6) scratch off paper using knife or water (only enough to solder to)
- step 7) solder a 30awg or smaller wire to that electrode
- step 8) add a female header socket to the end of the 30 gauge wire
- step 9) add more PSA
- step 10) add 1/4" polyethalyne to back of sensor to protect it
- step 11) add a LED, EL, matrix or other type of back light to illuminate this assembly
Make new front panel (1 hour)
- cut wood to size
- cut plastic to size
- apply adhesive to surface and install window
Install Monitor (2 hour)
- Cut out hole
- Design and install retention system
- must be removable
Need LED Ring (4 hours)
- make template
- stack 3 1/8" sheets together
- cut out template
- drill 40 holes
- Wire in 40 LEDs common cathode.
- Wire 5 drive circuits
Need to design door (2 hours)
- Need to cut door out
- install piano hinge
- install rigid extrusions
- install backing
- install combi-lock
Need Foot Stands (30 mins)
- Lathe
- 4 Delrin holes
Need a mechanism to lock booth down
Need lift handles
Need to buy backdrop
[done]Need wheels
[done]Need pull handle
[done]Need to buy and laminate wood